Saturday, January 21, 2006



The walls are up and the door is made and fitted.

Now all we need to do is "pour" the cement layer on top. The lodge has been filled with wooden braces and filled with hard foam (we found at the tip).. A layer of sand was then added to form the mound. Then a layer of blue plastic as you can see in this photo.

Next Jon put reinforcement bar over the top and connected it to the reinforcement bar left coming out of the outside walls. Rocks were laid in places under the "bar" to hold it up.

Jon and Phil then poured the cement layer on top to form the roof.